The cost is just the cost. If it doesn’t get built to Euston, the rest of HS2 is basically almost pointless
this post was submitted on 01 Oct 2024
3 points (100.0% liked)
UK Rail and Trains
215 readers
1 users here now
Talk about the UK rail network.
founded 1 year ago
MODERATORS
I know it is never going to happen Euston needs a full rebuild. It is, by far, the worst terminus in London. It is completely unsafe, inaccessible, and unable to cope with its capacity needs. Even Lumo trains are better.