this post was submitted on 01 Jun 2024
394 points (97.6% liked)

Technology

59135 readers
3141 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS
 

[T]he report's executive summary certainly gets to the heart of their findings.

"The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs," says the report. "But the few SMRs that have been built (or have been started) paint a different picture โ€“ one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb."

you are viewing a single comment's thread
view the rest of the comments
[โ€“] jabjoe@feddit.uk 6 points 5 months ago* (last edited 5 months ago)

Not to mention slow to build. Takes about a decade to get a nuclear plant going. If that is replacing coal, you are burning that coal during construction. The CO2 cost of that should be taken into account when comparing to much quicker renewables (approx 2 years). Also pouring all that concrete. Once it's build, sure it's green, but that is expensive, takes ages and comes with a big CO2 cost to get going.

Or you go renewable now, turn the filthy coal off about 8 years sooner and save a ton of money and CO2 right now.