[T]he report's executive summary certainly gets to the heart of their findings.

"The rhetoric from small modular reactor (SMR) advocates is loud and persistent: This time will be different because the cost overruns and schedule delays that have plagued large reactor construction projects will not be repeated with the new designs," says the report. "But the few SMRs that have been built (or have been started) paint a different picture – one that looks startlingly similar to the past. Significant construction delays are still the norm and costs have continued to climb."

you are viewing a single comment's thread
view the rest of the comments
[-] sushibowl@feddit.nl 13 points 4 months ago

"Theoretically" is worth very little. It is pretty much the same for every concept NPP, that once construction starts on an actual practical plant, ugly problems start coming up all over the place that were not considered or thought of in the concept stage. Corrosion is one of the biggest ones.

See also the Rickover memo.

this post was submitted on 01 Jun 2024
394 points (97.6% liked)

Technology

58521 readers
4792 users here now

This is a most excellent place for technology news and articles.


Our Rules


  1. Follow the lemmy.world rules.
  2. Only tech related content.
  3. Be excellent to each another!
  4. Mod approved content bots can post up to 10 articles per day.
  5. Threads asking for personal tech support may be deleted.
  6. Politics threads may be removed.
  7. No memes allowed as posts, OK to post as comments.
  8. Only approved bots from the list below, to ask if your bot can be added please contact us.
  9. Check for duplicates before posting, duplicates may be removed

Approved Bots


founded 1 year ago
MODERATORS