First of all, is my terminology correct? These are brands of synthetic wood alternatives:

Is “construction board” the generic name for this stuff? I think some people call them “building panels”. I ask because my search for Invidious (Youtube) vids came up short. I would rather not have a brand-dependent search query because I have to try many queries as it is to try to get this answer.

Qboard offers a factory made corner piece (called Qorner; attached to this post). I was trying to work out how I could do that myself. I’ve never worked with #constructionBoard, nor have I used a router, but I suspect they use a router to cut a “V” in the board without competely bottoming out (but nearly), so the outer skin does not get cut. Has anyone done this?

you are viewing a single comment's thread
view the rest of the comments
[–] ciferecaNinjo@fedia.io 2 points 1 year ago

Does the shutoff valve have to be in the shower? Could it be moved to the other side of a wall outside of the shower?

The valve joins a steel pipe to PEX. Both pipes are still bedded in concrete even though I cleared away the concrete that the valve was embedded in. The valve could be moved but the pipe joints remain in place because it would be too big of a project to unbury all of it, cut the steel pipe & thread it, etc. So if I move the valve the box would still need to be accessible in case the joints fail.

I need to update that other thread. I’ve already drilled a 14mm hole in the wall and ran a shaft through it which is now attached to a right angle gearbox mounted on the new valve, which has a replaceable cartridge. So what’s left to do is getting a custom handle on the shaft that goes through the wall and I need to build the box.