this post was submitted on 16 Feb 2024
30 points (100.0% liked)
Do It Yourself
7724 readers
1 users here now
Make it, Fix it, Renovate it, Rehabilitate it - as long as you’ve done some part of it yourself, share!
Especially for gardening related or specific do-it-yourself projects, see also the Nature and Gardening community. For more creative-minded projects, see also the Creative community.
This community's icon was made by Aaron Schneider, under the CC-BY-NC-SA 4.0 license.
founded 2 years ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
12/2 is what I bought for the basement lights I’m working on. Everything I read said that was the appropriate wire to use so I never even co sidered #14
Make sure you’re buying 14/2 or 12/2 that has a ground wire and running that back to the breaker box. I saw the job you did with the big cable in the floor and it didn’t look like you ran a new cable that had a ground wire. It’s best to replace the old shoddy stuff with circuits that are up to code, even if you’re doing it DIY and your area doesn’t require homeowners to get it inspected. The codes are designed to prevent fires and loss of life.
That was a 240v circuit. It didn’t have a ground because it was 10/3. I had the money to get the stuff with a ground, but they were sold out and I couldn’t get anything for a few weeks so I went with the no ground but it is still up to code and manufacturer approved.
This does have a ground and black is going to the breaker with white and ground going to the ground bar.
This is the main panel, right? If it is a sub panel, it is a meaningful shock hazard to have neutral and ground bonded together.