this post was submitted on 12 Nov 2023
69 points (89.7% liked)
Climate - truthful information about climate, related activism and politics.
5243 readers
441 users here now
Discussion of climate, how it is changing, activism around that, the politics, and the energy systems change we need in order to stabilize things.
As a starting point, the burning of fossil fuels, and to a lesser extent deforestation and release of methane are responsible for the warming in recent decades:
How much each change to the atmosphere has warmed the world:
Recommended actions to cut greenhouse gas emissions in the near future:
Anti-science, inactivism, and unsupported conspiracy theories are not ok here.
founded 1 year ago
MODERATORS
you are viewing a single comment's thread
view the rest of the comments
view the rest of the comments
Or...go ahead and build out a lot more solar, wind, and storage at lower cost
Even that isn't enough.
We still need to ruthlessly end North American car dependency...and reduce beef consumption...and stop fast fashion...and stop planned obsolescence and throw away crap
So…stop kapitalism? What are you? Communist?
I consider myself a hybrid. Some things, a market just doesn't work, like infrastructure and medicine.
Some things, like entertainment, restaurants, etc, REGULATED markets are best. Regulations are vital though. Costs can't be externalized. No bailouts. Your business goes under, tough.
This is usually considered a Social Democrat. Or a Marxist. Using the government to limit the worst effects of capitalism. I especially love the idea that business can fail, something fought very hard for under capitalism - because capital never wants to lose.
what if you're too big to fail though? surely captains of industry would be bailed out like always
Then you get nationalized or broken up like ma bell.
then your “bailout” isn’t a bailout but a buyout by the public sector, and then probably split up and sold in parts to recoup whatever money they can and make sure it’s not too big to fail in the future
I am.
I’d take that too.
Wind and Solar have limitations that Nuclear does not.
SMRs have advantages over traditional Nuclear.
The current problem is that they don't yet have the economies of scale to compete in the "free market". This ignores that there is not actually a free market when it comes to energy. Solar, Wind, Coal, and Oil all get subsidized at rates that Nuclear never sees.
There was a big effort to get nuclear to have a learning-by-doing and scale up. In the US at least, it largely failed leaving an industry incapable of competing on cost
The larger part of it is that in the 70s there was a concentrated effort by both the extreme environmentalists and the oil lobby to hamstring nuclear. The effects have been felt somewhat worldwide.
That's when the US subsidies were massively cut back and regulations put in that started to balloon costs for new plants.
Then Three-Mile-island happened, and the groundwork was already in place to tighten the belt even further.
To address your point a bit. Solar and Wind had large parts of the development cost handled by government grants, and then instillation costs as well.
All energy gets subsidies. Nuclear gets far less than anyone else, and yet has regulations that actually add costs. Hell, operating plants need to pay yearly licensing fees that are not cheap.
The red tape and regulatory morass makes even starting a nuclear project thousands of times harder than starting a solar or wind farm.
You have to have a full build plan submitted before you're even allowed to do a site survey. You then have to pay roughly $300 an hour for that plan to be reviewed. Then, when the plan is denied, you have to do the entire plan again, and you still haven't done a site survey.
Once the plan is approved, you do your site survey. You'll have to adjust the plan based on conditions at the site. This will usually be minor changes. Moving some things around, reinforcing a foundation due to the soil conditions. Stuff that every build project goes through. Only now your plan doesn't match the approved version, so you have to stop and resubmit at another $300 an hour.
So, building a plant takes a long time, if any regulation changes during that build time, you have to change your plan to meet the new regs, but now your plan doesn't match the approved version, so you have to stop and get it re-approved at $300 an hour. Then you have to tear out any parts that don't match the regs and rebuild them.
All of this is added to the fact that yes, most (American) nuclear plants are basically prototypes, in that they are custom designs, and most of their parts need to be special ordered. This adds immense cost.
SMRs kind of sidestep both issues. You get one reactor plan approved, it's a self-contained unit that's shipped to the site.
They're also all identical, and can be built in bulk. You can have supply chains for the parts to drive costs down further.
The main stumbling block are the first dozen or so reactors. Building up the factories to build the reactors is going to be costly.
Russia has the VVER series, which is standardized and built in higher numbers by relativly cheap Russian workers. Hard to say they sell extremly well abroad.
South Korea has hte APR-1400 which is build in somewhat higher numbers as well. However sales are still limited to basicly the UAE and the oney built in Korea.
At the same time you have massive construction of renewables in developing countries today. Those are countries which have a hard time handing over subsidies.