this post was submitted on 29 Sep 2023
1055 points (98.1% liked)

Memes

45666 readers
1281 users here now

Rules:

  1. Be civil and nice.
  2. Try not to excessively repost, as a rule of thumb, wait at least 2 months to do it if you have to.

founded 5 years ago
MODERATORS
 
you are viewing a single comment's thread
view the rest of the comments
[โ€“] evranch@lemmy.ca 3 points 1 year ago (1 children)

I wonder if these high costs are due to it being passenger rail inside a major city. I'm curious if this cost applies to freight rail as well.

Out here in the countryside it seems that a mile of freight rail should be worth much less than a mile of highway. Everything from easement size to site prep, equipment needed and bill of materials seems a fraction of that required for highway construction.

As mentioned elsewhere the maintenance is minimal compared to a highway as well, with the trains plowing snow themselves and the rails being very hard-wearing. The only work we ever see them doing on the rail lines is occasionally replacing sleepers and fixing up the road crossings - and it's heavy trucks that ruin those, not the trains.

[โ€“] popcap200@lemmy.ml 1 points 1 year ago

Yeah, I'd definitely be curious on more detailed numbers.